Building Plan Approval

  1. Copy of Physical Possession Slip.
  2. Agreement to Sell.
  3. Owners CNIC Copy.
  4. 3 Sets Submission Drawings.
  5. Soft Copy of Drawings.
  6. Proposed Construction Schedule.
  7. Architecture & Registered Engineer s Certificate.
  8. Structure Stability Certificate (Annexure D1).
  9. Sign Stamped By-Laws Book.
  10. Nature of Business.
  11. Soil Test Report.
  12. Structure Drawings 3 sets.
  13. Electrical Drawings 3 Sets.
  14. ERA construction Phase NOC.
  15. Fire Fighting Plan.
  16. Dues clearance.

Note: After Submitting the Online Application, the Customer must Submit a heard copy of the application in the BOM-MIE Office. 